| Category: | Cycleway: Other (infrastructure-related) |
| Tags: | None |
| Date: | 8.26am, 16th January, 2008 |
| Facing: | North east |
| CC Attribution-Share Alike (by-sa) | |
| View full-size original | |
| In gallery/ies: |
|
Crossings upgrade with tactile paving installed, railings removed and poles positioned in the cycle way. Jan 2008. Previous: #11671
(Note: Because crossing does not lead to entry pupils from the Manor School usually do not use the PUFIN crossing).
Comments reflect the views of the original submitter only.
Street View panel will appear here.
Google Street View at, or near to this location, where available.