| Category: | Cycleway: A problem that needs to be fixed |
| Tags: | path |
| Date: | 1.59pm, 17th February, 2010 |
| Facing: | North |
| CC Attribution-Share Alike (by-sa) | |
| View full-size original | |
| In gallery/ies: |
|
Presumably this is a temporary "bridge" across the bog on Salary Brook, but it has been here for sometime. The missing and broken mesh bares testament to that. It is now a puncture hazard as the metal wires stick up in places.. better off ripping it up, or better still, lay a new tarmac pathway in place of the whole structure.
Comments reflect the views of the original submitter only.
Street View panel will appear here.
Google Street View at, or near to this location, where available.