You may also be interested in the automatic categorisation listings and themed galleries.
Flooding in this area as reported at: http://travellingtheguidedbusway.blogspot.co.uk/2012/05/busway-cycle-track-flooded.html
Faced with a flooded underpass (see #20797 and #20798), students will climb the boggy slope to the right, and risk life and limb crossing the busy A133 (see #20799 and #20800).
If the student makes it across (see #20799) the busy, 50mph A133 dual carriageway above the flooded underpass (see #20797 and #20798) they have then to negogiate the railings and the boggy slope (see #20801) down to the Salary Brook shared ... [more]
The result of flooding in the A133 underpass (see #20797 and #20798) is that students will "chance their luck" crossing the busy 50 mph dual carriageway.
When it rains the A133 underpass from Boundary Road to Salary Brook is impassable due to flood water. This is the quickest and most direct route to Greenstead from Essex University, and indeed a recommended route on the Greenstead/Salary Br ... [more]
When it rains the A133 underpass from Salary Brook to Boundary Road is impassable due to flood water. This is the quickest and most direct route to Essex University from Greenstead, and indeed a recommended route on the Greenstead/Salary Br ... [more]
Newly relayed surface of shared pathway across King's Meadow, done to such a poor standard it floods with rain.
A little bit of water is no problem for the horse. Photos along the route of the Busway between Oakington and St Ives.