All photos

Showing items 4101 to 4200 from total of 35,528 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
34039Photo #34039NCN 4 looping above itself on the Avoncliff aqueductCycleway:
Infrastructure
cycleway marker
34038Photo #34038NCN 4 looping above itself on the Avoncliff aqueductRoute sign:
Infrastructure
directional_signage marker
34037Photo #34037NCN route 4 loops beneath itself at the Avoncliff aqueductCycleway:
Infrastructure
cycleway marker
34036Photo #34036Cyclists on the Avoncliff aqueduct, NCN route 4Cycleway:
Event
cycleway marker
34035Photo #34035Cyclist on the Avoncliff aqueduct, NCN route 4Cycleway:
Event
cycleway marker
34034Photo #34034Parking at Avoncliff station on NCN route 4 (no real road access)Cycle parking:
Infrastructure
sheffield_stands marker
34033Photo #34033NCN route 4 takes a very dramatic kink in Avoncliff to cross to the other side of the canalCycleway:
Infrastructure
cycleway marker
34032Photo #34032NCN route 4 marking on the towpath of the Kennet and Avon CanalRoute sign:
Infrastructure
directional_signage marker
34031Photo #34031Towpath of the Kennet & Avon Canal (NCN route 4)Cycleway:
Infrastructure
cycleway marker
34030Photo #34030TT Cycles (as in Towpath Trail), Bradford on AvonBike shop:
Infrastructure
spanner marker
34029Photo #34029Very permeable new developmentCycleway:
Good practice
cycleway marker
34028Photo #34028Very permeable new development.Cycleway:
Good practice
cycleway marker
34027Photo #34027minimalist contraflow, brunswick st (backed up by 20mph)Other:
Infrastructure
white_wisp marker
34025Photo #34025Cycle crossing at entrance to Filton Abbey Wood station.Cycleway:
Infrastructure
cycleway marker
34024Photo #34024Worn cycle track using a layby outside Filton Abbey Wood stationCycleway:
Infrastructure
cycleway marker
34023Photo #34023Worn cycle track crossing access road to Filton Abbey Wood stationCycleway:
Infrastructure
cycleway marker
34022Photo #34022More parking needed at Filton Abbey Wood - a new station built with inadequate cycle facilities.Cycle parking:
Problem
sheffield_stands marker
34021Photo #34021Access to Filton Abbey Wood station from massive new office complex.Cycleway:
Infrastructure
cycleway marker
34020Photo #34020Lots of No Cycling signs on the path to Filton Abbey Wood - couldn't they just widen it?General sign/notice:
Problem
general_sign marker
34019Photo #34019Lots of No Cycling signs on the path to Filton Abbey Wood - couldn't they just widen it? And provide proper parking too?General sign/notice:
Problem
general_sign marker
34018Photo #34018Cut-through to Filton Abbey Wood station - dropped kerb needed.Cycleway:
Problem
cycleway marker
34017Photo #34017A rider emerges from the fine illuminated mist outside the Crucible theatre in the centre of Sheffield, which some websites claim is England's fourth largest city.Destination:
Good practice
destination marker
34016Photo #34016This footpath is made out of grave headstones.Other:
Infrastructure
white_wisp marker
34015Photo #34015NCN6 no special road markings here, other than faded ones.Road environment:
Infrastructure
road marker
34014Photo #34014The road narrowing here is being used as a car park and the cycle lane through that is obviously not working. Lessons to learn here!Road environment:
Problem
road marker
34013Photo #34013Road narrowing and speed cushionsRoad environment:
Infrastructure
road marker
34012Photo #34012Speed cushions and road narrowing, the narrow cycle lane has disappeared here.Road environment:
Infrastructure
road marker
34011Photo #34011Speed cushions on the NCN6Road environment:
Infrastructure
road marker
34010Photo #34010Good cycle by-pass and traffic calming, but the cycle lane looks a bit narrow.Road environment:
Infrastructure
road marker
34009Photo #34009NCN6 has just entered a residential area.Cycleway:
Good practice
cycleway marker
34008Photo #34008Riders on the NCN 6 enter the "Child Safety Zone", to that muse mean they're leaving the "Child Danger Zone" ??? ;-)General sign/notice:
Good practice
general_sign marker
34007Photo #34007Toucan crossing on the NCN 6Road environment:
Good practice
road marker
34006Photo #34006Erk! These boulders are probably necessary to stop joyriding vehicles but in the dark they're a real threat to the unsuspecting rider.Obstruction:
Problem
obstruction marker
34005Photo #34005Cycleway NCN 6 very wide here - there even seems to be a passing place!

I think this may also be the NCN67 too, but not sure.
Cycleway:
Good practice
cycleway marker
34004Photo #34004NCN 6Route sign:
Good practice
directional_signage marker
34003Photo #34003Cycleway markings partly hidden by autumn leavesCycleway:
Infrastructure
cycleway marker
34002Photo #34002NCN 6Cycleway:
Good practice
cycleway marker
34001Photo #34001NCN 6Cycleway:
Good practice
cycleway marker
34000Photo #34000Cycling and walking signs marked on the NCN67 Trans Pennine TrailCycleway:
Good practice
cycleway marker
33999Photo #33999Poorly maintained signage at a key NCN junction.Other:
Misc
white_wisp marker
33998Photo #33998Poorly maintained sign in a poorly maintained area.General sign/notice:
Problem
general_sign marker
33997Photo #33997Good wide cycleway continues hereCycleway:
Good practice
cycleway marker
33996Photo #33996NCN67 cycleway continues here along the flat.Cycleway:
Good practice
cycleway marker
33995Photo #33995Sustrans gate on the NCN67. This one has been opened so that it can easily be bypassed.Obstruction:
Good practice
obstruction marker
33994Photo #33994Decorated wall side and underpass.Cycleway:
Good practice
cycleway marker
33993Photo #33993Cycleway goes down and to the left alongside a decorated wall.Cycleway:
Good practice
cycleway marker
33992Photo #33992After cycling through miles of green space its a bit of a shock to come out so close to a big urban motorway.Cycleway:
Infrastructure
cycleway marker
33991Photo #33991Lined up outside Trinity Hall College on Trinity Lane. Could do with Cycle racks...Cycle parking:
Misc
sheffield_stands marker
33990Photo #33990Fast cycleway here down then upCycleway:
Infrastructure
cycleway marker
33989Photo #33989Good fast downhill section hereCycleway:
Good practice
cycleway marker
33988Photo #33988Think the give way line should be behind this cycle lane, not in front.Other:
Misc
white_wisp marker
33987Photo #33987More from Norfolk Park Rd (The Street View shows you how it used to look)Other:
Misc
white_wisp marker
33986Photo #33986New contra-flow scheme, Norfolk Park Rd. We thought they were going to go for a more minimalist "except cyclists" approach but they've gone for plenty of engineering!Other:
Infrastructure
white_wisp marker
33985Photo #33985The bicycle parking outside Westminster University, Regent Street, has been removed recently, and there is no sign of its reintroduction. This is causing massive problems for students and lecturers at this important institution.Cycle parking:
Problem
sheffield_stands marker
33984Photo #33984A cycleway joining onto the NCN 67Cycleway:
Good practice
cycleway marker
33983Photo #33983Contemplating the final 5 miles into Sheffield (they were great and went quite quickly!)Cycleway:
Good practice
cycleway marker
33982Photo #33982Another cycle access gate, the mobility scooter got through this gap too - after she folded in her wing mirror.Obstruction:
Good practice
obstruction marker
33981Photo #33981Sheffield City Centre only 5 more miles to the left.

The other sign is vandalised and needs some more over-stickers.
Route sign:
Good practice
directional_signage marker
33980Photo #33980Side by side riding on the NCN 67 TPT
http://www.transpenninetrail.org.uk/
Cycleway:
Good practice
cycleway marker
33979Photo #33979Great cycleway - NCN67 TPT

http://www.transpenninetrail.org.uk/
Cycleway:
Good practice
cycleway marker
33978Photo #33978Its OK to get off and walk for a bit - especially, if like this Cambridge cyclist, hills are a bit of a shock.Cycleway:
Good practice
cycleway marker
33977Photo #33977Paths wide enough for pleasant side by side cycling.Cycleway:
Good practice
cycleway marker
33976Photo #33976These bicycle access narrowings vary a bit some quite tight, others loose. There's a horse step over on the left.Obstruction:
Good practice
obstruction marker
33975Photo #33975Here the NCN67 TPT http://www.transpenninetrail.org.uk/ crosses a road.Road environment:
Good practice
road marker
33974Photo #33974Good wide cycleway here on the NCN67 and TPT http://www.transpenninetrail.org.uk/Cycleway:
Good practice
cycleway marker
33973Photo #33973Excellent wide hard surface cycleway.

TPT is the http://www.transpenninetrail.org.uk/
Cycleway:
Good practice
cycleway marker
33972Photo #33972Another narrowing and a horse step over continue this bridleway / NCN route. Sadly the noticeboard is damaged and the fence warns of anti-climb paint.Cycleway:
Infrastructure
cycleway marker
33971Photo #33971On the right there's a bicycle access and a step-over for horses onto this bridleway.Cycleway:
Infrastructure
cycleway marker
33970Photo #33970Long slow incline hereCycleway:
Infrastructure
cycleway marker
33969Photo #33969New bicycle-repair outfit! Cheap prices, co-operatively owned, teaching events, sign up and get involved!

http://pedallers-arms.org/
Bike shop:
Infrastructure
spanner marker
33968Photo #33968No cycle racks AT ALL implemented as of yet, completely ridiculous!!!Cycle parking:
Problem
sheffield_stands marker
33967Photo #33967Riding along the NCN 67 only a small gradient here.Cycleway:
Good practice
cycleway marker
33966Photo #33966Site of Birley East Colliery 1888-1943Destination:
Good practice
destination marker
33965Photo #33965This wide cycleway on NCN 67 across open land was once the site of Birley East Colliery 1888-1943.Cycleway:
Good practice
cycleway marker
33964Photo #33964Cycleway on top of former colliery areaCycleway:
Good practice
cycleway marker
33963Photo #33963Enjoying a short break for a picnic.Cycleway:
Event
cycleway marker
33962Photo #33962Overlooking some of the route we've cycled this morning.Cycleway:
Infrastructure
cycleway marker
33961Photo #33961Another restriction - necessary here to stop motor vehicles getting onto the bridge behind the camera.

This is on the TPT see: http://www.transpenninetrail.org.uk/
Obstruction:
Good practice
obstruction marker
33960Photo #33960We've heard recently Danny Dorling describe this sort of thing as 'the open sewers of the 21st century'.

Certainly the chevrons on the roundabout make it look rather more like a race-track than it needs to be.
Road environment:
Infrastructure
road marker
33959Photo #33959Nice and wide cycle bridge on NCN 67.Cycleway:
Good practice
cycleway marker
33958Photo #33958Riders crossing a bridge on the NCN cycle routeCycleway:
Good practice
cycleway marker
33957Photo #33957These narrowings are necessary, but to be honest a bit wearing, along this cycle route.Obstruction:
Good practice
obstruction marker
33956Photo #33956Access to the cycle route here could benefit from a dropped kerb here.Cycleway:
Problem
cycleway marker
33955Photo #33955Traffic calming on the NCN67 route.Road environment:
Good practice
road marker
33954Photo #33954NCN on road section - there is some traffic calming along here.Road environment:
Infrastructure
road marker
33953Photo #33953Necessary restriction on NCN routes to permit cycles, but prohibit motorised vehicles.Obstruction:
Good practice
obstruction marker
33952Photo #33952CyclewayCycleway:
Infrastructure
cycleway marker
33951Photo #33951Out of the country cycleway and back onto the road - an cars routinely parked across the pavement.Road environment:
Problem
road marker
33950Photo #33950The signs here are a bit faded and unclear.Route sign:
Problem
directional_signage marker
33949Photo #33949Channels to help get your bike up and down the stepsCycleway:
Good practice
cycleway marker
33948Photo #33948Lots of folk out today enjoying this cyclewayCycleway:
Good practice
cycleway marker
33947Photo #33947Wonderful woodland cyclewayCycleway:
Good practice
cycleway marker
33946Photo #33946Lovely section of the NCN67 through overhanging trees here.Cycleway:
Good practice
cycleway marker
33945Photo #33945Good hard wide surface hereCycleway:
Good practice
cycleway marker
33944Photo #33944Joining the Trans Pennine Trail (TPT). Left for Beighton (where we went) and right to Rother Valley country park.Route sign:
Good practice
directional_signage marker
33943Photo #33943The cycle route has narrowed significantly here but still good surface.Cycleway:
Infrastructure
cycleway marker
33942Photo #33942This Sustrans cycle route runs along an old railway line as is evident here at this bridge - and with the motorbike deterrent gate at the end.Cycleway:
Good practice
cycleway marker
33941Photo #33941Good wide riding surface here, allowing conversationCycleway:
Good practice
cycleway marker
33940Photo #33940Access point to the bridleway for horses and stern no parking signsCycleway:
Good practice
cycleway marker
33939Photo #33939Sustrans NCN cycle track on former railway routeCycleway:
Good practice
cycleway marker

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *





Your comments: *
URL of page: * http://www.cyclestreets.net/photos/all/page42.html
How did you find out about CycleStreets?:
Your name:
Our ref:

* Items marked with an asterisk [*] are required fields and must be fully completed.