The highest rated, most recent photos are listed first. See also photomap view.
Road closure for the Cambridge Half-marathon - after the Cycling Campaign's rapid intervention squad opened it up a bit.
Cyclists struggling with the road closure for the Cambridge Half-marathon before the Cycling Campaign's rapid intervention squad opened it up a bit.
Part-time pedestrian zone, closed more thoroughly for the Edinburgh Festival and Fringe.
"Cyclists dismount", French style. Shared use cycle route blocked for maintenance of the Council of Europe offices. Pedestrians are asked to use the pavement on the other side of the road. See also #33273.
"Cyclists dismount", French style. Shared use cycle route blocked for maintenance of the Council of Europe offices. See also #33275
Most of cycleway on Parkers Piece has been barriered off with officials stopping anyone travelling through. No signage to warn of this. You cannot travel diagonally accross. Barriers have been partially blocking the entrance to Parkers Pie ... [more]
Road works at the city end of Riverside, Cambridge; cycleway closed but as I (Kevin Steinhardt) always use the road just to the south, this closure isn't affecting me. May affect you though.
"High-speed tests" could be running as of tomorrow (13th December 2010) on the northern section of the guided busway. I think the Cambridge News published the date of Thursday, which would be Thursday 16th December. The cycleway (left of fr ... [more]
"High-speed tests" could be running as of tomorrow (13th December 2010) on the northern section of the guided busway; as shown in this frame, the busway proper has been taped-off to deter cyclists from using it while tests are being conduct ... [more]
New Bit was, on 22 September 2010, closed for widening and resurfacing; the works are still taking place to my knowledge.
Information about what's happening at New Bit. There is a notice at the Brooklands Avenue entrance too. The dashed lines in green show the diversion route.
Cycleway upgradation works are affecting traffic on Madingley Road, but at least pedestrians (technically, still traffic) are being catered for.
A plethora of signs at roadworks on Mill Road. See photo #24024 for a close-up and photo #24023 for an earlier sign about the roadworks
The earlier sign #24023 on Mill Road said "Cyclists Access as usual" but at the actual road closure this one says "Cyclists Please Dismount and Use Footpath". In practice the footpath is reasonably wide and only a short stretch of road is c ... [more]
Wow, a cyclist-friendly sign at road works on Mill Road. There's a photo #24024 of the next sign as well.
Traffic lights and alternating two-way traffic while Trinity St is closed for work on underground pipes
Rush-hour collision at the Royal Cambridge Hotel roundabout - cyclists getting through, other traffic backed up way down the Barton Road.
Rush-hour accident at the Royal Cambridge Hotel roundabout - clearing up a cyclist's bits and pieces. Five or six emergency vehicles, major congestion.
DSC00112 Location: Cheapside, London (England, United Kingdom) This is some road works for the installation of the cycle hire scheme on Queen Victoria Street eastbound just south of St Pauls Cathedral. Ironically there is a sign telli ... [more]
Cycleway closed to to roadworks several miles further east - of course no-one can be expected to actually ride on the highway....