Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cycleparking, cyclistsdismount, new, rail, railway, ramp, station |
Date time: | 11.39am, Tuesday 24th July, 2018 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Denny |
A new ramp up to a new car park and cycle parking (see #101148), linked to Falkirk High station. The gap in the railing halfway up is for a dirt path leading to Slamannan Road.
Comments reflect the views of the original submitter only.