Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a9falkirk, atgrade, bridge, crossing, endofcycleroute, endofroute, ramp |
Date time: | 12.45pm, Tuesday 24th July, 2018 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Denny |
The path, rather than coming to an end as the sign suggests, crosses the A9 at grade, and continues across the far side. There is also a shared-use footway alongside the A9 to the right.
Comments reflect the views of the original submitter only.