Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | douglas-lanark, lanarkbiggar, sign |
Date time: | 4.08pm, Sunday 5th August, 2018 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Lanarkshire |
Signage for the original Biggar to Lanark (Kirkfieldbank) cycle route, but no signage for the route in the Douglas/Happendon direction. A newer Biggar to Lanark cycle route has been provided via Hyndford Bridge, but involves cycling along the A73 on painted cycle lanes.
Comments reflect the views of the original submitter only.