Category: | Cycleway: Other (infrastructure-related) |
Tags: | hilly, path, playingfields, resurfaced |
Date time: | 1.38pm, Tuesday 24th July, 2018 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Denny |
A newly resurfaced path to Camelon at the Sunnyside playing fields. Plenty of gradients.
Comments reflect the views of the original submitter only.