Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: A problem that needs to be fixed |
Tags: | blockage, cambridge |
Date time: | 10.39am, Wednesday 26th September, 2018 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
I've discovered that this access from the Cambridge North station area to Cambridge Commercial Park is blocked off this morning.
Comments reflect the views of the original submitter only.