Category: | Cycleway: Other (infrastructure-related) |
Tags: | france, rouen |
Date time: | 10.05am, Wednesday 15th August, 2018 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Cycleway crossing the busway (and then zigging around a building - couldn't the crossing have led straight to the end of the building?)
Comments reflect the views of the original submitter only.