Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: A problem that needs to be fixed |
Tags: | blockage, cyclesignals, mess, obstruction, roadworks, wcw |
Date time: | 10.23am, Sunday 4th November, 2018 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
I'm not sure what the barriers here are meant to achieve, or why they are blocking the flagship cycleway on Waterloo Street.
Comments reflect the views of the original submitter only.