Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bollard, crossing, cyclistsrejoincarriageway, tactiles, toucan, westerway |
Date time: | 11.20am, Sunday 4th November, 2018 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bearsden |
The Wester Way ends at Westerhill Road and awaits the building of the next phase of the Bishopbriggs Relief Road, and a new path alongside the railway to Lenzie.
Corduroy tactiles have been provided (not cycleway tactiles) even though this is an unsegregated shared path.
Comments reflect the views of the original submitter only.