Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cambridge, newbit |
Date time: | 12.47pm, Saturday 22nd December, 2018 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
After being closed for several weeks, this is now a properly surfaced and drained route (no change to the bridge, though).
Comments reflect the views of the original submitter only.