Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: A problem that needs to be fixed |
Tags: | fulbournroad |
Date time: | 10.10am, Sunday 6th January, 2019 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
End of Cycle Way sign between two sections of shared-use path...and it's big enough for drivers to read at 60mph. What is the point...?
Ed (simon): It might be due to the comment in #53964?
Comments reflect the views of the original submitter only.