Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | a8014, clearway, crossing, droppedkerb, kerb, kilbowie, linesegregation, nostopping, roundabout, toucan, trafficsignals |
Date time: | 1.16pm, Saturday 23rd March, 2019 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
The start of the Kilbowie Roundabout cycleway when coming from Kilbowie Road southbound.
One presumes that the 'No Stopping Clearway' and 'Give Way to Pedestrians' signs aren't aimed at the same roaduser, even though they are mounted one about the other.
Comments reflect the views of the original submitter only.