Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: Other (infrastructure-related) |
Tags: | busstop, endofcycleroute, endofroute, kerb, whitehills |
Date time: | 11.42am, Friday 12th April, 2019 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Lanarkshire |
End of the Whitehills cycle route, but with a Toucan crossing across Quarry Road it could be extended along the path to Greenhills. The nearest dropped kerb to join the carriageway is at the uncontrolled crossing beyond the bus stop.
Comments reflect the views of the original submitter only.