Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a725, dualcarriageway, merge, roundabout |
Date time: | 2.51pm, Friday 12th April, 2019 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Lanarkshire |
Room for the cycle track at Whitemoss Roundabout to continue alongside the dual carriageway to reach Birniehill Roundabout, but instead, the cycle track merges with the A725 Kingsway carriageway.
The footway to the left continues roughly parallel to the main road.
Comments reflect the views of the original submitter only.