Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, chisholmtrail, dittonmeadows, ncn51, tree, trunk |
Date time: | 10.04am, Monday 12th August, 2019 |
Time line: | Earlier | Later |
Facing: | Bearing of 299° |
Added by: | simon |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Cambridge |
Tree trunk on Ditton Meadows where work begins today until summer 2020 for construction of the Abbey - Chesterton foot and cycle bridge.
Comments reflect the views of the original submitter only.