Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | crossing, parallel, wakefield, zebra |
Date time: | 11.21am, Tuesday 3rd September, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Castleford |
A flavour-of-the-month parallel cycle/zebra crossing on the way from Kirkgate station into Wakefield city centre. There is a fairly narrow passageway beneath the building ahead, but it looks like the building itself is on borrowed time.
Comments reflect the views of the original submitter only.