Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bypass, ncn66, transition |
Date time: | 8.19am, Wednesday 4th September, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Baildon |
The connection from the painted cycle lane to the parallel zebra crossing over to the segregated cycle track on Valley Road.
Comments reflect the views of the original submitter only.