Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | carpark, droppedkerb, end, linesegregation, transition |
Date time: | 4.35pm, Monday 2nd September, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Baildon |
The line-segregated path ends and the cycle route to the station continues through the Waterloo Road car park.
Comments reflect the views of the original submitter only.