Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | blackbearpark, warringtonroute8 |
Date time: | 10.00am, Saturday 28th September, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | peteowens |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Birchwood |
Link from Black Bear Park to Maple Grove.
There used to be an obstructive "A Frame" barrier here - the two wooden posts are much easier to negotiate - though completely pointless.
Comments reflect the views of the original submitter only.