Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | droppedkerb, endofcycleroute, hereford |
Date time: | 5.53pm, Sunday 15th September, 2019 |
Time line: | Earlier | Later |
Facing: | Bearing of 316° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bromyard |
Shared use foot / cycleway, Hereford.
The "End of Cycle Route" sign suggests rejoining the carriageway at this dropped kerb, although it is not very clear as there is no change in surface quality or width of this footway.
Comments reflect the views of the original submitter only.