Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | a726, barrier, crashbarrier, crossing, dualcarriageway, footway, nsl, roundabout |
Date time: | 12.38pm, Friday 29th November, 2019 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The lack of cycle facilities on the A726 could be addressed by a modest upgrade of the existing footway to shared-use standards.
Note that the dropped kerb crossing on the far side of the roundabout has been completed blocked for pedestrians by the installation of the crash barrier.
Comments reflect the views of the original submitter only.