Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | changes, clydetunnel, droppedkerb, junction, tunnel |
Date time: | 11.29am, Friday 29th November, 2019 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The Clyde Tunnel cycle track now has a dropped kerb across the end of it at the Cressy St junction.
Comments reflect the views of the original submitter only.