Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 11.20am, Tuesday 31st July, 2007 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Cycle symbol just after the East Road toucan crossing eradicated by the works that took place. The old cycle lane which it was part of ended just before the crush point anyway.
The Cycling Campaign has been arguing for the wide pavement on the right past the the crush point to be narrowed slightly and the space increased on road to provide a cycle lane.
Comments reflect the views of the original submitter only.