Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a726, drainage, ek1, mud, puddle, roundabout, tyretracks |
Date time: | 1.03pm, Wednesday 4th March, 2020 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Lanarkshire |
The accumulating mud on the cycle track at the Righead Roundabout shows that, despite conditions, people are using it. The underpass on the right leads to cycle tracks on the other sides of the roundabout.
Comments reflect the views of the original submitter only.