Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | buildingwork, diversion, ncn756, path, redevelopment, riverside, southbank |
Date time: | 3.41pm, Wednesday 4th March, 2020 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The Clyde Place cycleway has been shut for building works, but a diversion has been established via the riverside walkway.
Comments reflect the views of the original submitter only.