Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | pembroke, wales |
Date time: | 4.55pm, Tuesday 17th March, 2020 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cilgerran |
Steep link from central Pembroke to NCN route 4
Comments reflect the views of the original submitter only.