Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | comberton |
Date time: | 12.12pm, Monday 25th May, 2020 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
I'm thrilled to see that a dropped kerb has appeared here, making this shared-use path useable at last.
Comments reflect the views of the original submitter only.