Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 4.06pm, Saturday 6th October, 2007 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | davidhembrow |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | David Hembrow |
New properly segregated path replacing older hybrid style provision. Also note that the road is being reduced from three lanes at this point to two.
Comments reflect the views of the original submitter only.