Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 2.09pm, Tuesday 30th October, 2007 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
The Gonville Parallel Crossing, restored from a botched toucan arrangement, after pressure from Cambridge Cycling Campaign.
Comments reflect the views of the original submitter only.