Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: A problem that needs to be fixed |
Tags: | fulbourn, roadworks, tesco, twitterimport |
Date time: | 11.42am, Tuesday 2nd June, 2020 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | radwagon |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/RadWagon/status/1267842893714259977 |
Credit: | Rad Wagon [Twitter username: 'RadWagon'] |
This is a busy cycle route from Fulbourn into Cambridge.
Building works have left no provision for people riding. t.co/xJ9Y6Fjbc6
Comments reflect the views of the original submitter only.