Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 10.27pm, Wednesday 10th June, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Kingston upon Thames |
Enforce 20mph with massive Thames Water and Network Rail lorries and contractors. Very popular walking/cycling route but extremely unsafe with current levels of speeding traffic, pavement too narrow and only on one side of road. Widen to include proper cycling provision.
Comments reflect the views of the original submitter only.