Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, greatkneighton, trumpingtonpark |
Date time: | 12.38pm, Friday 12th June, 2020 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Not quite a crossing to nowhere, but the footway/cycleway on the far side is about 100m long.
Comments reflect the views of the original submitter only.