Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 4.56pm, Friday 18th April, 2008 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | unnameduser39 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | R Kidd |
Area: | Cambridge |
Repainted cycle lane opposite CRC entrance on Kings Hedges Road. Maybe the first one will be removed, but the kink has been methodically removed from pole 1 and reapplied to pole 2. The other poles in the lane presumably don't need to be avoided. The lane also used to end in a dropped kerb to feed into the bus stop - now the kerb's been built up so the cyclist is presumably supposed to cycle through those waiting at the bus stop.
Comments reflect the views of the original submitter only.