Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | ncn24 |
Date time: | 2.12pm, Tuesday 21st July, 2020 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bath |
There are two gates on this section of the Colliers Way (NCN route 24), and a link left to the road.
Comments reflect the views of the original submitter only.