Category: | A sign, usually on the cycleway network, indicating a route for cycling.: Other (infrastructure-related) |
Tags: | doncaster, ncn62, tpt |
Date time: | 2.05pm, Thursday 30th July, 2020 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Adwick le Street |
Route signs on the Trans Pennine Trail (NCN route 62) at the Braithwaite lift bridge.
Comments reflect the views of the original submitter only.