Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cambridge, ncn51, newdevelopment |
Date time: | 2.46pm, Wednesday 26th August, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 280° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
The cycle route through the Wing Development appears to be complete without diversions. There's a gate halfway along which is opened by a construction worker whenever cyclists / walkers need it.
Comments reflect the views of the original submitter only.