Category: | Cycleway: Event or temporary issue |
Tags: | None |
Date time: | 4.04pm, Sunday 16th November, 2008 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
It took about eight years to move the dropped kerb past the double post signage to avoid the bottle neck of the two-way shared-use pavement. How long will it take to change the paint on the ground which currently leads into the newly raised kerb? (See #15315, #15332 #15333 and #15340)
Comments reflect the views of the original submitter only.