Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | cambridge, newbit |
Date time: | 11.06am, Saturday 7th November, 2020 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
This section of cycleway has been resurfaced and the stud lights have vanished - the second time this has happened. It also needs clearing of dead leaf mush.
Comments reflect the views of the original submitter only.