Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: An example of good practice |
Tags: | buildout, cambrdge, double-yellow, droppedkerb |
Date time: | 2.59pm, Wednesday 18th November, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 318° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Marmora Road build out at junction with Suez Road. There is a dropped kerb within the buildout.
Comments reflect the views of the original submitter only.