Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | ncn11, stapleford |
Date time: | 4.14pm, Friday 29th January, 2021 |
Time line: | Earlier | Later |
Facing: | Bearing of 158° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Raised cycleway by about fifteen inches to get a bit above the flood.
Comments reflect the views of the original submitter only.