Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | aberystwyth, cycleway, nmu |
Date time: | 1.15pm, Monday 15th February, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo/tfw |
Area: | Aberaeron |
Construction of Non-Motorised User path from the Gogerddan Campus (the Institute of Biological, Environmental and Rural Sciences) of Aberystwyth University to the new Bow Street station, opened in February 2021.
Comments reflect the views of the original submitter only.