Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, trumpington |
Date time: | 3.53pm, Thursday 4th March, 2021 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
The current state of the Addenbrookes-Trumpington path - you can go down Hering Road and then join the path.
Comments reflect the views of the original submitter only.