Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 5.47pm, Tuesday 9th March, 2021 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | backnotes |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Work under way to complete the missing bit of NMU path alongside the A1307 between Fenstanton and Swavesey. This work will link to the stub of path that extends NW from Swavesey junction with A14.
Comments reflect the views of the original submitter only.