Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, chisholmtrail |
Date time: | 4.24pm, Thursday 18th March, 2021 |
Time line: | Earlier | Later |
Facing: | Bearing of 286° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
This apparently will be the main route of the Chisholm Trail towards the main station.
Comments reflect the views of the original submitter only.