Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, jetty |
Date time: | 3.12pm, Monday 12th April, 2021 |
Time line: | Earlier | Later |
Facing: | Bearing of 24° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Jetty surface looks good.
Comments reflect the views of the original submitter only.