Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Event or temporary issue |
Tags: | a814, corduroy, crossing, raisedcrossing, tactiles, toucan, underconstruction |
Date time: | 3.50pm, Thursday 22nd April, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
A new toucan crossing next to Miller Street. The carriageway has been raised to the same level as the footway, and corduroy tactile paving is used to mark the edge of the footway since the kerb is flush.
Comments reflect the views of the original submitter only.